Step 4 · Sell

See what it sells for

Price, fill and contract terms, as scenarios.

Markets / Operators / VIRTUS

VIRTUS data centre projects in Europe

Projects tracked
5
of 1 MW or more
Permitted or being built
4
1 at announcement stage
Countries
3
with at least one project
Milestones, last 90 days
1
newest Jul 2026

As of (newest check)

Our European pipeline tracker follows 5 data-centre projects of 1 MW or more that VIRTUS develops or co-develops, in 3 countries; 4 are permitted or already being built. The largest share is in Germany, with 2 projects.

80% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Feb 2024 to Jul 2026.

Projects by stage

  • Announced 1
  • Permitted 2
  • Under construction 2

What the capacity figures measure

  • IT load 4
  • Facility, campus or unstated basis 1

Stated size, where a figure is published

  • 20 to 49 MW 2
  • 50 to 99 MW 2
  • 100 to 249 MW 1

Bands mix bases, so read them as orders of size; never added.

Where VIRTUS is building

Latest milestones

The newest 3 steps we recorded, by market and stage.

  1. Jul 2026LondonAnnounced
  2. Jun 2026GermanyUnder construction
  3. Jun 2025GermanyUnder construction
Method

Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.

  • Projects VIRTUS develops or co-develops; a joint venture counts once per partner.
  • Capacities are on different bases: counted, never added.
  • From public filings and announcements; DC Blueprint is independent of VIRTUS. No project is listed.

Cite as: DC Blueprint, “VIRTUS data centre projects in Europe”, https://dcblueprint.com/sell/operators/virtus (checked 17 Oct 2026). © DC Blueprint.