Markets / Operators / Equinix

Equinix data centre projects in Europe

Projects tracked
9
of 1 MW or more
Permitted or being built
5
1 at announcement stage
Countries
6
with at least one project
Milestones, last 90 days
3
newest Sep 2026

As of (newest check)

Our European pipeline tracker follows 9 data-centre projects of 1 MW or more that Equinix develops or co-develops, in 6 countries; 5 are permitted or already being built. The largest share is in France, with 2 projects.

56% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Nov 2024 to Sep 2026.

Projects by stage

  • Announced 1
  • In planning 3
  • Permitted 3
  • Under construction 2

What the capacity figures measure

  • IT load 1
  • Facility, campus or unstated basis 1
  • Grid connection 3
  • No capacity published 4

Stated size, where a figure is published

  • 50 to 99 MW 3
  • 100 to 249 MW 1
  • 250 MW and above 1

4 projects have no published capacity and are not in a band. Bands mix bases, so read them as orders of size; never added.

Where Equinix is building

Latest milestones

The newest 5 steps we recorded, by market and stage.

  1. Sep 2026NetherlandsIn planning
  2. Jul 2026MilanAnnounced
  3. Jul 2026AmsterdamPermitted
  4. Mar 2026DublinUnder construction
  5. Nov 2025Paris MRAe Île-de-France opinion on the ICPE environmental authorisation and building permit applicationIn planning
Method

Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.

  • Projects Equinix develops or co-develops; a joint venture counts once per partner.
  • Capacities are on different bases: counted, never added.
  • From public filings and announcements; DC Blueprint is independent of Equinix. No project is listed.

Cite as: DC Blueprint, “Equinix data centre projects in Europe”, https://dcblueprint.com/sell/operators/equinix (checked 17 Oct 2026). © DC Blueprint.