Equinix data centre projects in Europe
- Projects tracked
- 9
- of 1 MW or more
- Permitted or being built
- 5
- 1 at announcement stage
- Countries
- 6
- with at least one project
- Milestones, last 90 days
- 3
- newest Sep 2026
Our European pipeline tracker follows 9 data-centre projects of 1 MW or more that Equinix develops or co-develops, in 6 countries; 5 are permitted or already being built. The largest share is in France, with 2 projects.
56% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Nov 2024 to Sep 2026.
Projects by stage
What the capacity figures measure
Stated size, where a figure is published
4 projects have no published capacity and are not in a band. Bands mix bases, so read them as orders of size; never added.
Where Equinix is building
Latest milestones
The newest 5 steps we recorded, by market and stage.
- Sep 2026NetherlandsIn planning
- Jul 2026MilanAnnounced
- Jul 2026AmsterdamPermitted
- Mar 2026DublinUnder construction
- Nov 2025Paris MRAe Île-de-France opinion on the ICPE environmental authorisation and building permit applicationIn planning
Method
Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.
- Projects Equinix develops or co-develops; a joint venture counts once per partner.
- Capacities are on different bases: counted, never added.
- From public filings and announcements; DC Blueprint is independent of Equinix. No project is listed.
Cite as: DC Blueprint, “Equinix data centre projects in Europe”, https://dcblueprint.com/sell/operators/equinix (checked 17 Oct 2026). © DC Blueprint.