Markets / Operators / EdgeConneX
EdgeConneX data centre projects in Europe
- Projects tracked
- 12
- of 1 MW or more
- Permitted or being built
- 6
- 2 at announcement stage
- Countries
- 6
- with at least one project
- Milestones, last 90 days
- 4
- newest Sep 2026
Our European pipeline tracker follows 12 data-centre projects of 1 MW or more that EdgeConneX develops or co-develops, in 6 countries; 6 are permitted or already being built. The largest share is in Netherlands, with 6 projects.
50% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Sep 2024 to Sep 2026.
Projects by stage
What the capacity figures measure
Stated size, where a figure is published
4 projects have no published capacity and are not in a band. Bands mix bases, so read them as orders of size; never added.
Where EdgeConneX is building
Latest milestones
The newest 5 steps we recorded, by market and stage.
- Sep 2026Norway First building under construction on a 160 mål site acquired through two land companiesUnder construction
- Sep 2026SwedenAnnounced
- Aug 2026AmsterdamUnder construction
- Aug 2026AmsterdamIn planning
- Jun 2026AmsterdamPermitted
Method
Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.
- Projects EdgeConneX develops or co-develops; a joint venture counts once per partner.
- Capacities are on different bases: counted, never added.
- From public filings and announcements; DC Blueprint is independent of EdgeConneX. No project is listed.
Cite as: DC Blueprint, “EdgeConneX data centre projects in Europe”, https://dcblueprint.com/sell/operators/edgeconnex (checked 17 Oct 2026). © DC Blueprint.