Sell Intelligence

Step 4 · Sell · Intelligence

What the intelligence pages answer.

Five questions a data-centre board asks about Europe, answered from today’s dataset.

  • 474data-centre projects in the pipeline
  • 31market pages
  • 17countries in the grid connection tracker

Coverage and quality.

What is included
474 projects of 1 MW or more, or with no capacity published, in the EU, the UK, Norway and Switzerland, and 36 operators.
What is not covered
Sites in service over a year, projects under 1 MW and publicly disputed projects. No ratings of operators or sites.
Why the counts differ
31 market pages; the multi-year plan prices 17 of them; the grid tracker covers 17 countries.
Sources and units
Official records, linked on each tracker. Capacity keeps its source’s basis and is never added across bases.
Review cadence
Most rows are rechecked monthly and show their last check. What changed logs each week.
Corrections
Report an error from the contact page.

01

Where is new capacity being built, and how far along is it?

474 data-centre projects of 1 MW or more in 24 countries. 207 are permitted or being built, 114 of them already on site.

Checked 19 Oct 2026

Open the pipeline tracker

Projects by stage, Europe

474 projects

  • 267Announced or in planning
  • 93Permitted or contractor appointed
  • 114Under construction or structure complete

Projects are counted; capacities are never added. What changed this week.

02

Where can a new site still get a grid connection?

New connections are paused in all or part of 2 of the 17 countries we track and rationed in 5. Only 4 have no pause, cap or condition on them.

Checked 23 Oct 2026

Open the grid connection tracker

New connections for large loads

17 countries

  • 2Paused
  • 5Rationed
  • 2Congested
  • 4Conditional
  • 4No pause or cap

Paused or rationed in all or part of the grid.

03

How do the markets compare on the numbers that decide a site?

31 markets compared on up to six measures: projects, how many are permitted or being built, the rule on new grid connections, power price, grid carbon and latency to the nearest major hub.

Open the market pages

04

Who is building, and where?

36 operators and developers with three or more projects in the pipeline, 27 of them in more than one country.

Checked 18 Oct 2026

Open the operator pages

05

What does power cost and emit right now?

Grid carbon intensity and day-ahead power prices for 15 European markets, hour by hour, with the cleanest and the cheapest hours to run flexible compute.

Open the live grid

The datasets behind it.

The research behind the pages.

Two editions built from the same dataset.

  • Market study

    European Data Centre Economics 2026

    Edition 1 · Version 1.0, 11 October 2026· Evidence to 10 October 2026 What capacity sells for, what it costs to build and power, who is buying, and where the next margin sits
  • Pipeline report, quarterly

    European Data-Centre Pipeline Report

    Q4 2026 · Version 1.0, 11 October 2026· Evidence to 11 October 2026 Data-centre projects announced, in planning, permitted or under construction across Europe, by market, with the latest milestone of every project

All documents

Try the plan on round example values.

The multi-year plan opens on example values for a site you describe, with the market, the grid and the costs in one case. These pages stay free to read.

Open the plan