Markets / Operators / maincubes

maincubes data centre projects in Europe

Projects tracked
3
of 1 MW or more
Permitted or being built
2
1 at announcement stage
Countries
1
with at least one project
Milestones, last 90 days
1
newest Sep 2026

As of (newest check)

Our European pipeline tracker follows 3 data-centre projects of 1 MW or more that maincubes develops or co-develops, in 1 country; 2 are permitted or already being built. All of them are in Germany.

67% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Aug 2025 to Sep 2026.

Projects by stage

  • Announced 1
  • Under construction 2

What the capacity figures measure

  • IT load 2
  • Grid connection 1

Stated size, where a figure is published

  • Under 20 MW 1
  • 20 to 49 MW 1
  • 100 to 249 MW 1

Bands mix bases, so read them as orders of size; never added.

Where maincubes is building

Latest milestones

The newest 2 steps we recorded, by market and stage.

  1. Sep 2026FrankfurtAnnounced
  2. Apr 2026FrankfurtUnder construction
Method

Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.

  • Projects maincubes develops or co-develops; a joint venture counts once per partner.
  • Capacities are on different bases: counted, never added.
  • From public filings and announcements; DC Blueprint is independent of maincubes. No project is listed.