Green Mountain data centre projects in Europe

Projects tracked
3
of 1 MW or more
Permitted or being built
2
1 at announcement stage
Countries
2
with at least one project
Milestones, last 90 days
1
newest Aug 2026

As of (newest check)

Our European pipeline tracker follows 3 data-centre projects of 1 MW or more that Green Mountain develops or co-develops, in 2 countries; 2 are permitted or already being built. The largest share is in Norway, with 2 projects.

67% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Feb 2025 to Aug 2026.

Projects by stage

  • Announced 1
  • Under construction 1
  • Structure complete 1

What the capacity figures measure

  • IT load 2
  • Facility, campus or unstated basis 1

Stated size, where a figure is published

  • 20 to 49 MW 1
  • 50 to 99 MW 2

Bands mix bases, so read them as orders of size; never added.

Where Green Mountain is building

Latest milestones

The newest 2 steps we recorded, by market and stage.

  1. Aug 2026Norway Under construction with DC Nordics as main contractorUnder construction
  2. Aug 2025NorwayAnnounced
Method

Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.

  • Projects Green Mountain develops or co-develops; a joint venture counts once per partner.
  • Capacities are on different bases: counted, never added.
  • From public filings and announcements; DC Blueprint is independent of Green Mountain. No project is listed.

Cite as: DC Blueprint, “Green Mountain data centre projects in Europe”, https://dcblueprint.com/sell/operators/green-mountain (checked 17 Oct 2026). © DC Blueprint.