AtlasEdge data centre projects in Europe

Projects tracked
3
of 1 MW or more
Permitted or being built
2
1 at announcement stage
Countries
2
with at least one project
Milestones, last 90 days
1
newest Jul 2026

As of (newest check)

Our European pipeline tracker follows 3 data-centre projects of 1 MW or more that AtlasEdge develops or co-develops, in 2 countries; 2 are permitted or already being built. The largest share is in Germany, with 2 projects.

67% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Oct 2025 to Jul 2026.

Projects by stage

  • Announced 1
  • Under construction 2

What the capacity figures measure

  • Facility, campus or unstated basis 3

Stated size, where a figure is published

  • Under 20 MW 3

Bands mix bases, so read them as orders of size; never added.

Where AtlasEdge is building

Latest milestones

The newest 2 steps we recorded, by market and stage.

  1. Jul 2026Germany Groundbreaking (Spatenstich) for the next build phase of HAM002.Under construction
  2. Apr 2026GermanyUnder construction
Method

Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.

  • Projects AtlasEdge develops or co-develops; a joint venture counts once per partner.
  • Capacities are on different bases: counted, never added.
  • From public filings and announcements; DC Blueprint is independent of AtlasEdge. No project is listed.

Cite as: DC Blueprint, “AtlasEdge data centre projects in Europe”, https://dcblueprint.com/sell/operators/atlasedge (checked 18 Oct 2026). © DC Blueprint.