Step 4 · Sell

See what it sells for

Price, fill and contract terms, as scenarios.

Markets and operators: who is building where

The pipeline, the grid, the power, the latency and the rules of a market, and the operators building in it. Counts and dated figures, from the tracker and the official sources.

Plan a site in Switzerland

Data centres in Switzerland

At a glance: Switzerland

Pipeline projects
6
5 permitted or being built
Checked 17 Oct 2026
New grid connections
No pause or cap
No rule in force for Switzerland pauses, rations or conditions them
Checked 23 Oct 2026
Wholesale power price
99€/MWh
Day-ahead, 2025 mean of 9 months, Switzerland
Calendar year 2025
Grid carbon intensity
39g CO₂/kWh
Yearly average, Switzerland
Latest full year
Next national rule date
1 Jan 2027
End of the transition for the waste-heat rule in Article 23 of the Energy Act of Schaffhausen
Applies in Switzerland
Latency to nearest major hub
3.4 ms
Round trip, Zurich to Frankfurt
Mapped fibre route, minimum

Data checked

On 17 October 2026 the pipeline tracker lists 6 data-centre projects in Switzerland, and 5 of them are permitted or being built.

Data centres in Switzerland in October 2026

The tracker follows 6 data centre projects of 1 MW or more in Switzerland, 5 of them permitted or being built. 5 developers are behind them, led by Green Datacenter with 2 projects.

Projects by stage

  • Announced 1
  • Contractor appointed 1
  • Under construction 4

The whole European pipeline, country by country.

What the capacity figures measure

  • IT load 2
  • Facility, campus or unstated basis 2
  • No capacity published 2

Each capacity is on its own stated basis; never added.

Who is building in Switzerland

A joint venture counts once per partner. All operators and developers.

What changed

1 milestone in the last 90 days; the newest is from Sep 2026.

Power and grid in Switzerland

No pause or cap

No rule in force pauses, rations or conditions new grid connections here. Checked 23 Oct 2026. Every country’s grid connections.

Over a year, country level

Grid carbon, latest full-year average
39g CO₂/kWh
3rd cleanest of 30 countries; 98% renewable or nuclear
Wholesale power, 2025 average
99€/MWh
16th cheapest of 30

Climate at Zurich

Hours a year above 27 °C dry-bulb
168h
mean of 2016 to 2025
Hours a year above 32 °C dry-bulb
11h
worst year 32 h
Hours a year above 20 °C wet-bulb
120h
limit for evaporative cooling

Hourly reanalysis at the city’s grid cell, 2016 to 2025.

Annual averages are national, for the latest full year.

Fibre latency from Zurich

Round trips from Zurich
ToRound trip, minimumPath lengthPath
Milan2.2 ms225 kmMapped fibre route
Munich3.0 ms302 kmMapped fibre route
Frankfurt3.4 ms349 kmMapped fibre route
Paris5.9 ms601 kmMapped fibre route
Brussels6.7 ms681 kmMapped fibre route
Amsterdam7.0 ms715 kmMapped fibre route
London8.8 ms900 kmMapped fibre route
Dublin14 ms1,426 kmMapped fibre route

Floors for light in fibre, city centre to city centre; operator fibre adds to this.

Rules and dates

Next dates

  1. 1 Jan 2027end of the transition for the waste-heat rule in Article 23 of the Energy Act of Schaffhausen, a canton of Switzerland

Formal refusals and bans since 2025

No area-wide rule recorded for Switzerland.

Decisions from 1 Jan 2025; statuses checked 21 Oct 2026. A market with none recorded is not a low risk market.

Projects of 1 MW or more, announced to under construction, not yet fully operating; a metro includes its region. Capacities are never added, and no project is listed. Grid: new-connection status from the grid connection tracker. Over a year: national averages, latest full year. Latency: light in fibre over the mapped land route, else the straight line. Sources, 3 official bodies, checked 14 October 2026: Canton of Zurich, Copernicus Climate Change Service (ERA5), Swissgrid.