SEGRO data centre projects in Europe

Projects tracked
4
of 1 MW or more
Permitted or being built
2
none at announcement stage
Countries
2
with at least one project
Milestones, last 90 days
1
newest Jul 2026

As of (newest check)

Our European pipeline tracker follows 4 data-centre projects of 1 MW or more that SEGRO develops or co-develops, in 2 countries; 2 are permitted or already being built. The largest share is in France, with 2 projects.

50% are permitted or being built, against 44% across the whole tracker, so the pipeline is further along than the European average. The milestones we hold run from Apr 2025 to Jul 2026.

Projects by stage

  • In planning 2
  • Permitted 2

What the capacity figures measure

  • Facility, campus or unstated basis 1
  • Grid connection 1
  • No capacity published 2

Too few published capacities for size bands.

Where SEGRO is building

Latest milestones

The newest 2 steps we recorded, by market and stage.

  1. Jul 2026LondonPermitted
  2. Mar 2026London Pre-let agreed with an existing customer for a 30,000 sq m powered shellPermitted
Method

Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.

  • Projects SEGRO develops or co-develops; a joint venture counts once per partner.
  • Capacities are on different bases: counted, never added.
  • From public filings and announcements; DC Blueprint is independent of SEGRO. No project is listed.

Cite as: DC Blueprint, “SEGRO data centre projects in Europe”, https://dcblueprint.com/sell/operators/segro (checked 17 Oct 2026). © DC Blueprint.