Eclairion data centre projects in Europe

Projects tracked
4
of 1 MW or more
Permitted or being built
1
3 at announcement stage
Countries
1
with at least one project
Milestones, last 90 days
0
newest May 2026

As of (newest check)

Our European pipeline tracker follows 4 data-centre projects of 1 MW or more that Eclairion develops or co-develops, in 1 country; 1 is permitted or already being built. All of them are in France.

25% are permitted or being built, against 44% across the whole tracker, so the pipeline is earlier-stage than the European average. The milestones we hold run from Nov 2025 to May 2026.

Projects by stage

  • Announced 3
  • Under construction 1

What the capacity figures measure

  • Facility, campus or unstated basis 2
  • No capacity published 2

Too few published capacities for size bands.

Where Eclairion is building

Latest milestones

The newest 2 steps we recorded, by market and stage.

  1. May 2026FranceAnnounced
  2. Nov 2025France Site under constructionUnder construction
Method

Projects of 1 MW or more (or unstated), announced to under construction, that we have found and checked.

  • Projects Eclairion develops or co-develops; a joint venture counts once per partner.
  • Capacities are on different bases: counted, never added.
  • From public filings and announcements; DC Blueprint is independent of Eclairion. No project is listed.