Step 4 · Sell

See what it sells for

Price, fill and contract terms, as scenarios.

Markets and operators: who is building where

The pipeline, the grid, the power, the latency and the rules of a market, and the operators building in it. Counts and dated figures, from the tracker and the official sources.

Data centres in Romania

At a glance: Romania

Pipeline projects
3
1 permitted or being built
Checked 11 Oct 2026
Wholesale power price
109€/MWh
Day-ahead, 2025 mean, Romania
Calendar year 2025
Grid carbon intensity
260g CO₂/kWh
Yearly average, Romania
Latest full year
Next EU rule date
14 Dec 2026
The EU Commission’s minimum performance standards consultation and call for evidence closes
Applies EU-wide
Business electricity price
186€/MWh
Non-household, with network charges and taxes
Latest full year

Data checked

On 11 October 2026 the pipeline tracker lists 3 data-centre projects in Romania, and 1 of them is permitted or being built.

Data centres in Romania in October 2026

The tracker follows 3 data centre projects of 1 MW or more in Romania, 1 of them permitted or being built. 5 developers are behind them.

Projects by stage

  • Announced 2
  • Permitted 1

The whole European pipeline, country by country.

What the capacity figures measure

  • IT load 1
  • Facility, campus or unstated basis 2

Each capacity is on its own stated basis; never added.

Who is building in Romania

  • Danube Solar Seven 1
  • DriverAI LLC 1
  • Leviatan Group 1
  • S+B Gruppe AG 1
  • SANY Group 1

A joint venture counts once per partner. All operators and developers.

What changed

1 milestone in the last 90 days; the newest is from Sep 2026.

Power and grid in Romania

Over a year, country level

Grid carbon, latest full-year average
260g CO₂/kWh
20th cleanest of 30 countries; 68% renewable or nuclear
Business electricity price, latest full year
186€/MWh
19th cheapest of 26; wholesale is 57% of it
Wholesale power, 2025 average
109€/MWh
24th cheapest of 30
Cooling degree days
137a year
10-year national mean

Annual averages are national, for the latest full year.

Rules and dates

Next dates

  1. 14 Dec 2026the EU Commission’s minimum performance standards consultation and call for evidence closes
  2. 15 May 2027EU database and French reports due (every year)
  3. 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption

Formal refusals and bans since 2025

No area-wide rule recorded for Romania.

Decisions from 1 Jan 2025; statuses checked 21 Oct 2026. A market with none recorded is not a low risk market.

Projects of 1 MW or more, announced to under construction, not yet fully operating; a metro includes its region. Capacities are never added, and no project is listed. Grid: new-connection status from the grid connection tracker. Over a year: national averages, latest full year. Latency: light in fibre over the mapped land route, else the straight line. Sources, 1 official bodies, checked 23 October 2026: EUR-Lex (Official Journal of the EU).