Data centres in London

Oct 2026: 37 projects in the pipeline around London, 23 permitted or being built.New grid connections paused since 30 Jun 2025. Wholesale power €94/MWh in 2025.

Pipeline projects
37
23 permitted or being built
New grid connections
Paused
paused to new connection applications, in force since 30 Jun 2025. United Kingdom-wide, transmission
Wholesale power price
94€/MWh
Day-ahead, 2025 mean, United Kingdom

Plan a site in London

Pipeline movement, last 12 months

28 milestones ·

Nov 2025: 3Dec 2025: 1Feb 2026: 1Mar 2026: 3Apr 2026: 1May 2026: 1Jun 2026: 6Jul 2026: 7Aug 2026: 2Sep 2026: 3

217 data centres on record around London

Projects by stage

  • Announced 3
  • In planning 11
  • Permitted 18
  • Contractor appointed 1
  • Under construction 4

European pipeline

Who is building in London

All operators and developers

Capacity by stage

Facility power, all stages
1,410 MW
Facility power, under construction
333 MW
Projects
37

Stated by each project, . Bases are never added together.

Stated MW by stage and capacity basis, and projects by stage
StageIT load, MWFacility power, MWProjects
Announced122.52003
In planning37235511
Permitted56852219
Under construction·3334
In service··0

Premium Premium adds the quarterly series and all 37 projects. Frankfurt is open in full with a free account.

Market economics, London

Premium

Premium adds build cost, rents and power prices for London. Frankfurt is open in full with a free account.

Construction cost
Premium figure
EUR m per MW
Mar 2026
Colocation, wholesale
Premium figure
EUR per kW a month
Jun 2026
Colocation, 20 MW and more
Premium figure
EUR per kW a month
Aug 2026
Business electricity
Premium figure
EUR per MWh
H1 2026
Grid connection wait
Premium figure
years
Sep 2026
Permitting
Premium figure
months
2026
Property tax
Premium figure
EUR k per MW a year
Aug 2026
Staff cost
Premium figure
EUR k per FTE a year
2025

Create a free accountSee pricing

Operators in London

All operators

Where the data centres are around London

  • Slough 5
  • Buckinghamshire 4
  • Ealing 3
  • Dacorum 2
  • Epping Forest 2
  • Tower Hamlets 2
  • Barnet 1
  • Basildon 1
  • Bromley 1
  • Chelmsford 1
  • Dartford 1
  • Greenwich 1
  • Harlow 1
  • Havering 1
  • Hertsmere 1
  • Hillingdon 1
  • Hounslow 1
  • Newham 1
  • Reigate and Banstead 1
  • Runnymede 1

What changed

5 milestones since 1 Aug 2026; the newest is from Sep 2026.

Power and grid for London

Paused

New grid connections are paused (United Kingdom-wide, transmission, since 30 Jun 2025). Every country’s grid connections

Over a year, country level

Grid carbon, latest full-year average
217g CO₂/kWh
17th cleanest of 30 countries; 64% renewable or nuclear
Wholesale power, 2025 average
94€/MWh
14th cheapest of 30

Climate at London

Hours a year above 27 °C dry-bulb
61h
mean of 2016 to 2025
Hours a year above 32 °C dry-bulb
4h
worst year 17 h
Hours a year above 20 °C wet-bulb
45h
limit for evaporative cooling

Fibre latency from London

Round trips from London
ToRound trip, minimumPath lengthPath
Brussels3.5 ms357 kmMapped fibre route
Paris4.0 ms409 kmMapped fibre route
Amsterdam4.0 ms411 kmMapped fibre route
Dublin5.2 ms529 kmMapped fibre route
Frankfurt7.0 ms712 kmMapped fibre route
Zurich8.8 ms900 kmMapped fibre route
Munich10.0 ms1,017 kmMapped fibre route

Rules and dates

Next dates

  1. 1 Jan 2027the United Kingdom’s amended Climate Change Agreements regulations come into force and cover data facilities with an electricity supply of at least 200 kW

Formal refusals and bans since 2025

No area-wide rule recorded for London.

Other markets

Sources

Copernicus Climate Change Service (ERA5), Department for Energy Security and Net Zero, GOV.UK, London Assembly Planning and Regeneration Committee, London Borough of Havering, London Borough of Hounslow, NESO, Ofgem, Old Oak and Park Royal Development Corporation, Planning Inspectorate, Slough Borough Council, Thurrock Council.