Oct 2026: 35 projects in the pipeline around Frankfurt, 23 permitted or being built.New grid connections rationed since 1 Apr 2026. Wholesale power €90/MWh in 2025.

Pipeline projects
35
23 permitted or being built
New grid connections
Rationed
Reifegradverfahren, in force since 1 Apr 2026. Germany-wide, transmission
Wholesale power price
90€/MWh
Day-ahead, 2025 mean, Germany

Plan a site in Frankfurt

Pipeline movement, last 12 months

31 milestones ·

Nov 2025: 1Dec 2025: 5Jan 2026: 1Feb 2026: 2Mar 2026: 2Apr 2026: 3May 2026: 3Jun 2026: 6Jul 2026: 3Aug 2026: 1Sep 2026: 3Oct 2026: 1

218 data centres on record around Frankfurt

Projects by stage

  • Announced 8
  • In planning 4
  • Permitted 8
  • Contractor appointed 1
  • Under construction 11
  • Structure complete 3

European pipeline

Who is building in Frankfurt

All operators and developers

Capacity by stage

IT load, all stages
948.4 MW
IT load, under construction
279.4 MW
Projects
35

Stated by each project, . Bases are never added together.

Stated MW by stage and capacity basis, and projects by stage
StageIT load, MWFacility power, MWGrid connection, MWProjects
Announced10310.5·8
In planning90·2604
Permitted476·5329
Under construction279.42586014
In service···0

Premium Premium adds the quarterly series and all 35 projects. Frankfurt is open in full with a free account.

Market economics, Frankfurt

Premium

Frankfurt is open in full with a free account.

Construction cost
Premium figure
EUR m per MW
Mar 2026
Colocation, wholesale
Premium figure
EUR per kW a month
2026
Colocation, 20 MW and more
Premium figure
EUR per kW a month
May 2026
Business electricity
Premium figure
EUR per MWh
H1 2026
Grid connection wait
Premium figure
years
Apr 2026
Permitting
Premium figure
months
2026
Staff cost
Premium figure
EUR k per FTE a year
2024
Guarding, 24/7
Premium figure
EUR k a year
Apr 2026

Create a free accountSee pricing

Operators in Frankfurt

All operators

Where the data centres are around Frankfurt

  • Frankfurt 7
  • Dietzenbach 3
  • Hanau 2
  • Hattersheim am Main 2
  • Maintal 2
  • Schwalbach am Taunus 2
  • Bad Vilbel 1
  • Birstein 1
  • Butzbach 1
  • Großkrotzenburg 1
  • Heusenstamm 1
  • Hochheim am Main 1
  • Hofheim am Taunus 1
  • Karben 1
  • Mainz 1
  • Neu-Isenburg 1
  • Nierstein 1
  • Obertshausen 1
  • Offenbach am Main 1
  • Rosbach vor der Höhe 1

What changed

5 milestones since 1 Aug 2026; the newest is from Oct 2026.

Power and grid for Frankfurt

Rationed

New grid connections are rationed (Germany-wide, transmission, since 1 Apr 2026). Every country’s grid connections

Over a year, country level

Grid carbon, latest full-year average
330g CO₂/kWh
26th cleanest of 30 countries; 59% renewable or nuclear
Business electricity price, latest full year
216€/MWh
23rd cheapest of 26; wholesale is 46% of it
Wholesale power, 2025 average
90€/MWh
13th cheapest of 30

Climate at Frankfurt

Hours a year above 27 °C dry-bulb
282h
mean of 2016 to 2025
Hours a year above 32 °C dry-bulb
51h
worst year 95 h
Hours a year above 20 °C wet-bulb
100h
limit for evaporative cooling

Fibre latency from Frankfurt

Round trips from Frankfurt
ToRound trip, minimumPath lengthPath
Munich3.3 ms341 kmMapped fibre route
Zurich3.4 ms349 kmMapped fibre route
Brussels3.5 ms357 kmMapped fibre route
Amsterdam3.8 ms392 kmMapped fibre route
Paris5.9 ms599 kmMapped fibre route
London7.0 ms712 kmMapped fibre route
Dublin12 ms1,221 kmMapped fibre route

Rules and dates

Rules in force or proposed
WhereRuleStatus
EUReporting duty from 500 kW installed IT power, 7 items and 24 indicators, next report 15 May 2027In force
EUWaste-heat use above 1 MW total rated energy input, unless a cost-benefit assessment shows it is not feasibleIn force
EUCommon rating scheme adopted 21 Sep 2026; in Parliament and Council scrutiny, extended 6 OctAdopted, not in force
GermanyApplies from 300 kW non-redundant nominal connected load; 100% renewable electricity from 1 Jan 2027In force
GermanySites running before 1 Jul 2026: PUE 1.5 or lower from 1 Jul 2027 and 1.3 from 1 Jul 2030In force
GermanySites starting operation from 1 Jul 2026: PUE 1.2 or lower and a reused-energy share of at least 10%, rising to 15% and 20% for sites starting from 1 Jul 2027 and 1 Jul 2028, within two years of start-upIn force
GermanyBill to relax the PUE limits to 1.6 and 1.4; committee hearing held 5 Oct 2026Proposed

Next dates

  1. 14 Dec 2026the EU Commission’s minimum performance standards consultation and call for evidence closes
  2. 1 Jan 2027Germany’s EnEfG 100% renewable-electricity requirement takes effect, unless Drucksache 21/8027 passes first and moves it to 1 January 2030
  3. 31 Mar 2027Germany’s register report due (every year)
  4. 15 May 2027EU database and French reports due (every year)
  5. 1 Jul 2027Germany’s EnEfG reused-energy share for new sites rises to 15% for data centres starting operation from this date
  6. 1 Jul 2027Germany’s EnEfG PUE ≤1.5 deadline for sites that started operating before 1 July 2026, unless Drucksache 21/8027 passes first

Formal refusals and bans since 2025

No area-wide rule recorded for Frankfurt.

1 decision on a single site since 2025, not listed here.

Other markets

Sources

50Hertz, Amprion, Bundesnetzagentur, City of Frankfurt am Main, Copernicus Climate Change Service (ERA5), EUR-Lex (Official Journal of the EU), German Federal Ministry for Digital Affairs, Hessian administrative courts, Hessian Ministry for Digital Affairs, MITNETZ STROM, Netztransparenz (German TSOs), NRM Netzdienste Rhein-Main, Regierungspräsidium Darmstadt, Stadt Butzbach, Stadt Hattersheim am Main, Stadt Hofheim am Taunus, Stadt Karben, Stadt Offenbach am Main, Stromnetz Berlin, TenneT, TransnetBW.