Analysis
The numbers behind the plan
Dated, sourced analysis that feeds one step of the flow. Each piece ends where its numbers are used.
Operate · energy What one megawatt of flexible load is worth in 15 European power markets Moving 4 MWh a day to the cheapest hours would have saved EUR 85k to 217k per MW-year in 15 zones, on day-ahead energy prices alone.
Operate · security Moving from 24/7 on-site guarding to remote monitoring: what it costs and what you give up One security post staffed around the clock costs about €141,000 to €256,000 a year in wage floors in Spain, France and Belgium. What remote monitoring replaces, and what still needs a person on site.
Operate · energy Carbon-aware computing in Europe: what shifting load saves Shifting flexible compute to cleaner hours cuts reported emissions, but the saving depends on country, window and signal. Evidence and a checklist.
Operate · cooling and water AI Data Center Water Didn’t Vanish, It Moved Nvidia and Microsoft say they’ve crushed AI data center water use. They’re right, inside the walls. But the water did not disappear; it evaporated at the power plant instead, invisibly and at scale.
Operate · energy How to Reduce Data Centre PUE: Measures and Real Results Measured results and forecasts for cutting PUE, and the cases where a lower number saves nothing. Every figure sourced or marked as our calculation.
Operate · energy and cooling How Data Centers Actually Control Humidity (And Why It Matters) Learn how relative humidity impacts data centers, and discover actionable solutions to optimize RH levels and protect critical infrastructure. Read more now!