Data centres in Switzerland

Oct 2026: 7 projects in the pipeline in Switzerland, 5 permitted or being built.No pause or cap on new grid connections. Wholesale power €99/MWh in 2025.

Pipeline projects
7
5 permitted or being built
New grid connections
No pause or cap
No rule in force for Switzerland pauses, rations or conditions them
Wholesale power price
99€/MWh
Day-ahead, 2025 mean of 9 months, Switzerland

Plan a site in Switzerland

Pipeline movement, last 24 months

5 milestones ·

Nov 2024: 1May 2025: 1Sep 2025: 1Jan 2026: 1Sep 2026: 1

121 data centres on record in Switzerland

Projects by stage

  • Announced 2
  • Contractor appointed 1
  • Under construction 4

European pipeline

Who is building in Switzerland

All operators and developers

Capacity by stage

IT load, all stages
40.5 MW
IT load, under construction
12 MW
Projects
7

Stated by each project, . Bases are never added together.

Stated MW by stage and capacity basis, and projects by stage
StageIT load, MWFacility power, MWProjects
Announced28.5·2
In planning··0
Permitted·7.51
Under construction125004
In service··0

Premium Premium adds the quarterly series and all 7 projects. Frankfurt is open in full with a free account.

Market economics, Zurich

Premium

Premium adds build cost, rents and power prices for Zurich. Frankfurt is open in full with a free account.

Construction cost
Premium figure
EUR m per MW
Mar 2026
Grid connection wait
Premium figure
years
Oct 2026
Permitting
Premium figure
months
Oct 2023
Staff cost
Premium figure
EUR k per FTE a year
2025

Create a free accountSee pricing

Operators in Switzerland

All operators

What changed

1 milestone since 1 Aug 2026; the newest is from Sep 2026.

Power and grid in Switzerland

No pause or cap

No rule in force pauses, rations or conditions new grid connections here. Every country’s grid connections

Over a year, country level

Grid carbon, latest full-year average
39g CO₂/kWh
3rd cleanest of 30 countries; 98% renewable or nuclear
Wholesale power, 2025 average
99€/MWh
16th cheapest of 30

Climate at Zurich

Hours a year above 27 °C dry-bulb
168h
mean of 2016 to 2025
Hours a year above 32 °C dry-bulb
11h
worst year 32 h
Hours a year above 20 °C wet-bulb
120h
limit for evaporative cooling

Fibre latency from Zurich

Round trips from Zurich
ToRound trip, minimumPath lengthPath
Milan2.2 ms225 kmMapped fibre route
Munich3.0 ms302 kmMapped fibre route
Frankfurt3.4 ms349 kmMapped fibre route
Paris5.9 ms601 kmMapped fibre route
Brussels6.7 ms681 kmMapped fibre route
Amsterdam7.0 ms715 kmMapped fibre route
London8.8 ms900 kmMapped fibre route
Dublin14 ms1,426 kmMapped fibre route

Rules and dates

Next dates

  1. 1 Jan 2027end of the transition for the waste-heat rule in Article 23 of the Energy Act of Schaffhausen, a canton of Switzerland

Formal refusals and bans since 2025

No area-wide rule recorded for Switzerland.

Other markets

Sources

Canton of Zurich, Copernicus Climate Change Service (ERA5), Swissgrid.