Data centres in Dublin

Oct 2026: 12 projects in the pipeline around Dublin, 12 permitted or being built.New grid connections paused since 23 Nov 2021. Wholesale power €114/MWh in 2025.

Pipeline projects
12
12 permitted or being built
New grid connections
Paused
fully constrained, in force since 23 Nov 2021. Dublin, transmission
Wholesale power price
114€/MWh
Day-ahead, 2025 mean, Ireland

Plan a site in Dublin

Pipeline movement, last 12 months

9 milestones ·

Dec 2025: 1Mar 2026: 1Apr 2026: 1May 2026: 1Jun 2026: 1Jul 2026: 3Sep 2026: 1

109 data centres on record around Dublin

Projects by stage

  • Permitted 8
  • Under construction 3
  • Structure complete 1

European pipeline

Capacity by stage

IT load, all stages
106 MW
IT load, under construction
52 MW
Projects
12

Stated by each project, . Bases are never added together.

Stated MW by stage and capacity basis, and projects by stage
StageIT load, MWFacility power, MWProjects
Announced··0
In planning··0
Permitted54738
Under construction5294
In service··0

Premium Premium adds the quarterly series and all 12 projects. Frankfurt is open in full with a free account.

Market economics, Dublin

Premium

Premium adds build cost, rents and power prices for Dublin. Frankfurt is open in full with a free account.

Construction cost
Premium figure
EUR m per MW
Sep 2026
Business electricity
Premium figure
EUR per MWh
H1 2026
Grid connection wait
Premium figure
years
May 2026
Permitting
Premium figure
months
Sep 2026
Property tax
Premium figure
EUR k per MW a year
Sep 2025
Staff cost
Premium figure
EUR k per FTE a year
2024
Guarding, 24/7
Premium figure
EUR k a year
Apr 2026

Create a free accountSee pricing

Operators in Dublin

All operators

Where the data centres are around Dublin

  • South Dublin 8
  • Fingal 4

What changed

1 milestone since 1 Aug 2026; the newest is from Sep 2026.

Power and grid for Dublin

Paused

New grid connections are paused (Dublin, transmission, since 23 Nov 2021). Every country’s grid connections

Over a year, country level

Grid carbon, latest full-year average
256g CO₂/kWh
19th cleanest of 30 countries; 48% renewable or nuclear
Business electricity price, latest full year
202€/MWh
21st cheapest of 26; wholesale is 73% of it
Wholesale power, 2025 average
114€/MWh
27th cheapest of 30

Climate at Dublin

Hours a year above 27 °C dry-bulb
0h
mean of 2016 to 2025
Hours a year above 32 °C dry-bulb
0h
worst year 0 h
Hours a year above 20 °C wet-bulb
1h
limit for evaporative cooling

Fibre latency from Dublin

Round trips from Dublin
ToRound trip, minimumPath lengthPath
London5.2 ms529 kmMapped fibre route
Amsterdam8.1 ms831 kmMapped fibre route
Brussels8.7 ms883 kmMapped fibre route
Paris9.1 ms929 kmMapped fibre route
Frankfurt12 ms1,221 kmMapped fibre route
Zurich14 ms1,426 kmMapped fibre route
Copenhagen14 ms1,471 kmMapped fibre route

Rules and dates

Rules in force or proposed
WhereRuleStatus
EUReporting duty from 500 kW installed IT power, 7 items and 24 indicators, next report 15 May 2027In force
EUWaste-heat use above 1 MW total rated energy input, unless a cost-benefit assessment shows it is not feasibleIn force
EUCommon rating scheme adopted 21 Sep 2026; in Parliament and Council scrutiny, extended 6 OctAdopted, not in force
IrelandNew connecting data centres must match at least 80% of annual demand with additional renewable-electricity projectsIn force

Next dates

  1. 14 Dec 2026the EU Commission’s minimum performance standards consultation and call for evidence closes
  2. 15 May 2027EU database and French reports due (every year)
  3. 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption

Formal refusals and bans since 2025

  1. 12 Dec 2025Ireland, nationwide New large grid users must bring on-site or nearby dispatchable generation or storage and match demand with new Irish renewables. In force

2 decisions on single sites since 2025, not listed here.

Other markets

Sources

An Coimisiún Pleanála, Central Statistics Office (Ireland), Copernicus Climate Change Service (ERA5), CRU (Irish regulator), EirGrid, EUR-Lex (Official Journal of the EU), South Dublin County Council.