Oct 2026: 2 projects in the pipeline in Austria, 2 permitted or being built.No pause or cap on new grid connections. Wholesale power €99/MWh in 2025.

Pipeline projects
2
2 permitted or being built
New grid connections
No pause or cap
No rule in force for Austria pauses, rations or conditions them
Wholesale power price
99€/MWh
Day-ahead, 2025 mean, Austria

Plan a site in Austria

Pipeline movement, last 24 months

2 milestones ·

Apr 2026: 1Jul 2026: 1

76 data centres on record in Austria

Projects by stage

  • Under construction 2

European pipeline

Market economics, Vienna

Premium

Premium adds build cost, rents and power prices for Vienna. Frankfurt is open in full with a free account.

Construction cost
Premium figure
EUR m per MW
Nov 2025
Colocation, wholesale
Premium figure
EUR per kW a month
May 2026
Colocation, 20 MW and more
Premium figure
EUR per kW a month
May 2026
Business electricity
Premium figure
EUR per MWh
H1 2026
Permitting
Premium figure
months
Jul 2023
Staff cost
Premium figure
EUR k per FTE a year
2024
Guarding, 24/7
Premium figure
EUR k a year
Apr 2026

Create a free accountSee pricing

Operators in Austria

All operators

What changed

No milestone since 1 Aug 2026.

Power and grid in Austria

No pause or cap

No rule in force pauses, rations or conditions new grid connections here. Every country’s grid connections

Over a year, country level

Grid carbon, latest full-year average
117g CO₂/kWh
9th cleanest of 30 countries; 84% renewable or nuclear
Business electricity price, latest full year
188€/MWh
20th cheapest of 26; wholesale is 54% of it
Wholesale power, 2025 average
99€/MWh
17th cheapest of 30
Cooling degree days
34a year
10-year national mean

Fibre latency from Vienna

Round trips from Vienna
ToRound trip, minimumPath lengthPath
Prague2.8 ms286 kmMapped fibre route
Munich3.8 ms385 kmMapped fibre route
Berlin5.9 ms598 kmMapped fibre route
Frankfurt7.0 ms713 kmMapped fibre route
Paris11 ms1,099 kmMapped fibre route
Amsterdam11 ms1,103 kmMapped fibre route
London14 ms1,398 kmMapped fibre route
Dublin19 ms1,924 kmMapped fibre route

Rules and dates

Next dates

  1. 14 Dec 2026the EU Commission’s minimum performance standards consultation and call for evidence closes
  2. 15 May 2027EU database and French reports due (every year)
  3. 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption

Formal refusals and bans since 2025

No area-wide rule recorded for Austria.

Other markets

Sources

Austrian Power Grid (APG), EUR-Lex (Official Journal of the EU), RIS (Austrian federal law).