Data centres in Lithuania

Oct 2026: 2 projects in the pipeline in Lithuania, 1 permitted or being built.Wholesale power €86/MWh in 2025.

Pipeline projects
2
1 permitted or being built
Wholesale power price
86€/MWh
Day-ahead, 2025 mean, Lithuania
Grid carbon intensity
139g CO₂/kWh
Yearly average, Lithuania

Pipeline movement, last 24 months

2 milestones ·

Jun 2026: 1Oct 2026: 1

17 data centres on record in Lithuania

Projects by stage

  • Announced 1
  • Permitted 1

European pipeline

Capacity by stage

Grid connection, all stages
200 MW
Grid connection, under construction
0 MW
Projects
2

Stated by each project, . Bases are never added together.

Stated MW by stage and capacity basis, and projects by stage
StageGrid connection, MWProjects
Announced·1
In planning·0
Permitted2001
Under construction·0
In service·0

Premium Premium adds the quarterly series and all 2 projects. Frankfurt is open in full with a free account.

Operators in Lithuania

All operators

What changed

1 milestone since 1 Aug 2026.

Power and grid in Lithuania

Over a year, country level

Grid carbon, latest full-year average
139g CO₂/kWh
12th cleanest of 30 countries; 78% renewable or nuclear
Business electricity price, latest full year
124€/MWh
7th cheapest of 26; wholesale is 64% of it
Wholesale power, 2025 average
86€/MWh
10th cheapest of 30
Cooling degree days
16a year
10-year national mean

Rules and dates

Next dates

  1. 14 Dec 2026the EU Commission’s minimum performance standards consultation and call for evidence closes
  2. 15 May 2027EU database and French reports due (every year)
  3. 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption

Formal refusals and bans since 2025

No area-wide rule recorded for Lithuania.

Other markets

Sources

EUR-Lex (Official Journal of the EU), Litgrid.